Responsible for the design of all plumbing and fire protection systems for renovation of the existing visitor centers on 1st, 2nd, 80th, 86th and 102nd Floors. Developed design of all plumbing and fire protection systems including preparation of basis of design, calculations and specifications.
Responsible for the design of all plumbing and fire protection systems for renovation of the existing office spaces – various location throughout NYC. Developed design of all plumbing and fire protection systems including preparation of basis of design, calculations, specifications, and contract documents.
Responsible for the design of all plumbing and fire protection systems for a new 80,000 sf office space and museum for American Kernel. Developed design of all plumbing and fire protection systems including preparation of basis of design, calculations, specifications, and contract documents. Responsibilities also included review of the shop drawings and construction supervision.
Copyright © 2023 JTM Seiko - All Rights Reserved.
Powered by GoDaddy